Electra OU7-24 RC Instrukcja Obsługi Strona 154

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 153
6
Chart 8
Body
Hook
Ceiling
Panel
Chart 4
H (Ceiling height)
Body
Ceiling
Chart 5
Chart 6
Body
Body M6X12
Central hole
Installation paper
board
Chart 7
Grid
switch
Chart 9 Chart 10
Note: 24/27/30 Series B 240mm
36/45 Series B 310mm
Nut
B. New built houses and ceilings
a. In the case of new built house, the hook can be embedded in advance (refer to the A. B mentioned
above).
But it should be strong enough to bear the indoor unit and will not become loose because of concrete
shrinking.
b. After installing the body, please fasten the installation paper board onto the air conditioner with bolts
(M6X12) to determine in advance the sizes and positions of the hole opening on ceiling.
Please first guarantee the flatness and horizontal of ceiling when installing it.
Refer to the A. a mentioned above for others.
c. Refer to the A. c mentioned above for installation.
d. Remove the installation paper board.
CAUTIONS
After completion of installing the body, the four bolts (M6X12) must be fastened to the air conditioner to
ensure the body is grounded well.
2. Install the panel
CAUTIONS
Never put the panel face down on floor or against the wall, or on bulgy objects.
Never crash or strike it.
(1)Remove the inlet grid
a Slide two grid swiches toward the middle at the same time, and then pull them up. (Refer to chart 8)
b. Draw the grid up to an angle of about 45°, and remove it. (Refer to chart 9)
(2)Remove the installation covers at the four corners.
Wrench off the bolts, loose the rope of the installation covers, and remove them. (Refer to chart 10)
SZ000289/En 06/23/2004, 2:39 PM18
CONTENT
Przeglądanie stron 153
1 2 ... 149 150 151 152 153 154 155 156 157 158 159 ... 167 168

Komentarze do niniejszej Instrukcji

Brak uwag