Electra GC 24 RC Instrukcja Obsługi Strona 66

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 65
TUBING CONNECTIONS
10-1SM SX Ser1-A.3 GB
10. TUBING CONNECTIONS
TUBE (Inch)
TORQUE (Nm)
¼” ⅜” ½” ⅝” ¾”
Flare Nuts 11-13 40-45 60-65 70-75 80-85
Valve Cap 13-20 13-20 18-25 18-25 40-50
Service Port Cap 11-13 11-13 11-13 11-13 11-13
1. Valve Protection Cap-end
2. Refrigerant Valve Port (use Allen wrench to open/close)
3. Valve Protection Cap
4. Refrigerant Valve
5. Service Port Cap
6. Flare Nut
7. Unit Back Side
8. Copper Tube
When the outdoor unit is installed above the indoor unit an oil trap is required every 5m along the suction
line at the lowest point of the riser. Incase the indoor unit is installed above the outdoor, no trap is
required.
CONTENT
Przeglądanie stron 65
1 2 ... 61 62 63 64 65 66 67 68 69 70 71 ... 158 159

Komentarze do niniejszej Instrukcji

Brak uwag